Stock Number: 212121
Make: Skyjack
Model: SJ9250RT
Year: 2013


Stock Number: EQU01021
Make: Combilift
Model: C8000
Year: 2012


Stock Number: EQU001528
Make: Genie
Model: GS3369RT
Year: 2015


Stock Number: 1-16-600244
Make: Smartlift
Model: SL 608 Outdoor High Lifter
Year: 2017


Stock Number: 212519
Make: JLG
Model: 1932RS
Year: 2014


Stock Number: EQU002511
Make: Mitsubishi
Model: FG25N-LE
Year: 2014


 
Comedil Tower Cranes

Comedil Tower Cranes

When looking out over any bigger city skyline, you are likely to see tower cranes built beside tall buildings and skyscrapers. These big, remarkable structures are normally described as a central shaft which has counterweights and a long boom used to balance the load of the crane. There are numerous kinds of tower crane types. These lattice-woven structures are available for particular applications. Several popular types include bottom-slewing, top-slewing and self-erecting models. Slewing refers to turning around a fixed point. The main type of top-slewing tower crane that is used in construction these days is the horizontal boom. These eye-catching structures are found all over the world.

How to Erect a Tower Crane
A tower crane is common on construction sites to move supplies from low to high places and vice versa. These equipments are used in settings where a wheel-mounted crane is not big enough to finish out the work, like on high-rise structures. Just skilled professionals must be the ones to erect a tower crane. To be able to keep everyone safe, this job should be done by professionals. There is a high possibility of collapse, which can lead to extensive damage and loss if you try to raise it on your own with hardly any experience.

When preparing to build the crane, an excavator has to dig out a pit large enough for the crane's base. After that, this hole is filled with concrete. Steel anchors are set into the concrete, and after that, the first section of the crane's mast is attached. The concrete has to cure for 24 hours.

After the base has set, attach the first mast part securely to the anchors utilizing the proper bolts. Ensure that the mast is vertical by utilizing your spirit level. After that, fix another section of the mast by initially using bolts and keep repeating this method until your desired height has been attained. It will be necessary to employ a telescopic boom or a scissor lift in order to carry out this step.

  • Caterpillar Aerial Lifts
    There are various alternatives for access platforms these days. There is a lift designed for practically any jobsite application and ... More
  • Mitsubishi Used Forklifts
    Even though there are lots of companies who begin workers in the receiving area, they will be a lot better off to allot professionals to ... More
  • Potain Tower Cranes
    Several industrial and commercial buildings can reach heights of over 60 stories. Apparently, while these buildings are being ... More
  • Manitou Gas Forklift
    Nearly all companies will turn to the forklift to help them move particular objects from place to place or to carry out specific tasks. ... More
  • Crown Narrow Aisle Forklifts
    Very Narrow-Aisle Turret Trucks Within the lift truck industry, Crown has manufactured an innovate series of heavy-duty turret trucks, ... More